Guang'an · flagship
A 1:1 twin of a stepper-motor assembly line: AMRs link 11 stations where 10 robots assemble motors from incoming parts to boxing. Twin and line run in sync.
INDUSTRIES · EDUCATION
We build digital twins of the Inovance equipment colleges buy, so students program, debug and check logic in VUP before touching the real line, and we train teachers and students to use it.
4
college digital twin projects
8
VUP training sessions in 12 months
2022
CRM joint lab with Shanghai Institute of Technology
01 — COLLEGE PROJECTS
Projects from July 2025 to June 2026.
A 1:1 twin of a stepper-motor assembly line: AMRs link 11 stations where 10 robots assemble motors from incoming parts to boxing. Twin and line run in sync.
A twin of the Inovance equipment the college bought, so students write and debug programs in the virtual model before touching the real one.
A twin that shows how industrial motors are assembled and taken apart, with the models and motions teachers need.
A VUP twin of a fischertechnik training model, wired to Siemens and Inovance PLCs, so students practise PLC programming and control on model and twin together.
02 — WHY IT WORKS
Students program and debug against the twin, so mistakes cost nothing and nothing breaks.
The same exercise runs again and again, and every motion and signal can be seen.
VUP is the tool of the Inovance Cup; we train teachers and teams for it.
and on the CRM side
In 2022 we set up a CRM joint research lab with Shanghai Institute of Technology, bringing real CRM projects into the classroom.
READY TO TALK?
Share your goals, timeline or task list, and our team will take it from there.